Engineering delivery and quality — one shared view

Load EMI's ECN log and Technosoft's issue log to start. Every figure is calculated in your browser from the files below, and measured against the priority windows EMI has defined. Nothing is uploaded anywhere. The four marked optional each add pages; the tool works without them.

1. EMI ECN log

Drop the file here or browse. Several files can be added.

no file loaded

2. Technosoft issue log

Multiple tabs are handled automatically.

no file loaded

3. Weekly resource plan — optional

Adds the Team and capacity page. Counts only are read from it — no individual names and no commercial terms are stored.

no file loaded

4. Starbucks master schedule — optional

Adds the Schedule pages: submittal punctuality, where the time goes, and projects ahead.

no file loaded

5. EMI category assignments — optional

EMI’s own list of which of the eleven categories each change belongs to. Where a change appears in it the category is read from the file instead of proposed from the wording, and every row says which of the two it is.

no file loaded

6. Pre-release audit — optional

The audit EMI runs on Starbucks work before engineering release. Adds the Caught before release page, which counts it beside the change notices and never adds the two together.

no file loaded
Waiting for files.
Prepared jointly for the EMI Industries account. Every figure recalculates when the source files are reloaded. Nothing leaves this machine.